Friday 19 January 2018
Contact US    |    Archive
thestar
6 days ago

Feasibility study and designs cost RM305mil

GEORGE TOWN: The RM305mil was for the feasibility study as well as the detailed designs of three paired roads and the undersea tunnel.

Read on the original site


هذه الصفحة هي مجرد قاریء تلقائي للأخبار باستخدام خدمة الـ RSS و بأن نشر هذه الأخبار هنا لاتعني تأییدها علی الإطلاق.
Hashtags:   

Feasibility

 | 

study

 | 

and

 | 

designs

 | 

cost

 | 

RM305mil

 | 
What Are Today s Headlines?

What Are Today s Headlines?

- malaysiandigest
Most Popular (6 hours)

Bursa ends morning session higher

- themalaymailonline

Most Popular (24 hours)

What Are Today s Headlines?

- malaysiandigest

Most Popular (a week)

Categories - Countries
All News
Malaysia